Advocacy

ACTION ALERT: Support the Pilot on Roland Ave


A letter from Liz Cornish, Executive Director, Bikemore

Next Monday DOT will host a meeting to discuss whether or not to put down orange barrels for one mile on Roland Ave for four weeks. The idea is to determine if reducing that stretch of road to one lane is viable. If successful, it will demonstrate that it is possible to design a street that calms traffic, makes it safer get out of your car while parked in the street, and creates a wider, safer protected bike lane. Everyone has waited years for an improved design. We are ready to move forward.

Tell the City you support moving forward with the pilot. Tell the City that you support a protected bike lane on Roland Avenue.

Take action by sending an email to Councilwoman Sharon Green Middleton using this form:

Four years ago Tom Palermo, a beloved member of the bicycling community, and most importantly a husband and father, was killed on Roland Avenue using a bike lane on the outside of the curbside parking by Heather Cook. Cook was drunk, texting, and operating a vehicle without regard for human life. Bikemore existed before then, but there is no denying Tom’s death was a catalyzing moment for bike advocacy in Baltimore.

Shortly thereafter construction for a resurfacing and streetscaping project on Roland Avenue began, one planned long before Tom’s death. DOT moved forward with the existing design for three reasons: The Roland Park Civic League asked for a protected bike lane in their Master Plan, NACTO guidelines recommend it on streets where average vehicle speed and traffic volumes match that of Roland Avenue, and at the time it seemed unviable to garner public support for the removal of a traffic lane. There is also no doubt that Tom’s tragic death just mere blocks from the project also influenced their decision to build a protected bike lane.

Very few people are happy with the current configuration — including me. But over time a narrative emerged that people advocating for a bike lane were intruders. That only long standing residents should have a say. People with access to power typically have the upper hand. And so it was. Tensions ran high, public meetings were fraught, and the whole thing became absurd.

In this instance some people became blind with rage when their own extraneous interests weren’t given top priority. It also demonstrated that the City is still a long way from being able to respond to controversy fairly and with precision.

This is out of hand. The folks driving this controversy are no longer acting in good faith. People have been given four years to share their perspective. It’s time for a final decision to be made and move on.

I hope folks that attend the meeting take a step back and check the nastiness at the door. I hope everyone looks at the plans DOT drew up to put some barrels down on the street for four weeks and shrug their shoulders and say, ok.

There’s enough space on that street to make cars drive slower, to make it safer to exit your car when it’s parked on the street, and make a protected lane that people of all ages can safely and comfortably enjoy. Anyone that says different has decided to do so only to win a fight of their own making.

Making a public street that prioritizes the safety of all people over the convenience of cars is the best thing for everyone — even people who have made it clear that they disagree. Opponents have lots of tactics. They want more data — plenty exists. They want more time — they’ve had four years. They evoke concerns that stoke fear, like emergency response — that have no basis. They ask us to think of the children getting dropped off in cars — without regard to the kids who would like to bike but cannot do so safely. They say clearly that the road should be designed with only the people that use it the most in mind — rather than those most likely to be injured or killed. They say cyclists don’t deserve a bike lane since they already don’t follow the law — completely disregarding that in the case of people like Tom and too many others, it is the DRIVER WHO BROKE THE LAW AND KILLED SOMEONE.

I shake my head when people tell me I should stay away, not engage, not fan the flames. They forget this isn’t some pet cause or a hobby. This is advocacy for something that is proven to make people healthier and safer — something proven to save lives.

Druid Park Lake Drive Update

For three years, Bikemore has been devoting time and resources to advocating for traffic calming, lane reductions, and better biking and walking connections to Druid Hill Park along the expressway-sized roads that divide the park from adjacent communities. We were inspired by long-time neighbors who had put immense effort and resources behind things like the Druid Hill Farmers market to draw more west side neighbors to the park. We wanted to draw attention to the dangers of Druid Park Lake Drive, Auchentoroly Terrace, and Druid Park Drive , and the inequity these streets exacerbate by creating a chasm between beautiful, historic neighborhoods and a world-class historic park.

We began in 2016. Following the lead of our partner Rails-to-Trails and their effort to create a 35 mile protected greenway around the city, we spent months meeting with stakeholders to understand the challenges and opportunities. Out of that came a demonstration project meant to highlight the dangerous crossing at Gwynn Falls Parkway and Auchentoroly Terrace, a crossing that prevents young and elderly neighbors from safely accessing their neighborhood farmer’s market by foot.

In 2017, the issue gained more traction and we were able to direct resources to Reservoir Hill. A coalition was formed, led by Councilman Leon Pinkett, and neighbors, academics, artists, architects, and nonprofits met with DOT regularly to demand improvements and drive the process of making the streets safer forward.

The construction at the reservoir played an important role. With the popular lake loop obstructed, crossings eliminated, and traffic lanes reduced, suddenly the need to make the park safer, more accessible, and better programmed to serve the residents most in need felt more urgent. If we didn’t capitalize on this moment, it would be possible that once the EPA-mandated construction was complete that everything would go back to being the same.

More people weighed in after Davin Hong’s opinion piece linked above, focusing on the the historic and equity issues that made the case for acting now even more compelling.

Meanwhile, we continued to direct resources, meet neighbors, create art, and throw parties to get people to think differently about how Druid Park Lake Drive could be designed. We wanted the imagination of elected officials, neighbors, and city officials to soar – we wanted a Big Jump.


This week, in what is a small first step towards realizing this vision, the Department of Transportation issued a Request for Proposals for a design firm to do a study. This study will require a consultant to reach out to neighbors and other stakeholders and determine what Complete Street interventions would be the best way to take what has become a convenient thoroughfare for commuters and restore it to its original purpose. Druid Park Lake Drive was a way to gain access to the park. Not keep people away. Auchentoroly Terrace was a neighborhood street that children could safely cross to access a park, not a multi-lane highway with cars speeding in excess of 60 miles per hour.

You can read the RFP here. Over the next few months, our job will be to monitor and provide input into the RFP process and maintain a seat at the table during these early phases of community consultation and eventually, conceptual designs. It will also be our job to make sure neighbors’ voices are being heard. We will continue doing programming that connects people to the park, this design process, and to one another. We will be joined by residents who have been empowered in this process to seek change and conduct research themselves, including Dr. Daniel Hindman and artist Graham Coreil Allen of Auchentoroly Terrace.

This is the beginning of what will no doubt be a multi-year process. But as we reflect on the last three years, we are so proud of what we’ve been able to contribute to this important and historic effort. Projects like the Big Jump are always controversial. We heard a lot of no’s before those big white barriers got put up. But it did exactly what demonstration projects are supposed to do--demonstrate what’s possible when you connect communities with safe places to walk and bike for the first time.





Update on the Bike Budget (It's Bad)

Bikemore Executive Director Liz Cornish, Councilman Leon Pinkett, Councilman Ryan Dorsey, and MBAC Chair Jon Laria testifying at Planning Commission.

Bikemore Executive Director Liz Cornish, Councilman Leon Pinkett, Councilman Ryan Dorsey, and MBAC Chair Jon Laria testifying at Planning Commission.

A month ago, Baltimore City Department of Transportation released a FY2020-2025 Capital Improvement Program that totally eliminated the line item for bicycle infrastructure for all six years.

Three weeks ago, we testified at the Planning Commission alongside Councilman Dorsey, Councilman Pinkett, and Mayor's Bicycle Advisory Commission Chair Jon Laria about this disparity, and members of the Planning Commission suggested BCDOT come back with a budget that reflects the adopted plan.

Yesterday BCDOT did the opposite, by presenting a plan to the Mayor's Bicycle Advisory Commission to build only about six miles of infrastructure by 2025.

BCDOTs revised CIP at a meeting yesterday. The 12.7 miles listed are “lane miles” not road miles, which means DOT is counting bike infrastructure in both directions on a street to inflate their numbers.

BCDOTs revised CIP at a meeting yesterday. The 12.7 miles listed are “lane miles” not road miles, which means DOT is counting bike infrastructure in both directions on a street to inflate their numbers.

The Separated Lane Network Plan calls for building 77 road miles of infrastructure from 2018-2022, using $5 million in local dollars to match federal and state grants totaling about $27 million dollars over those five years.

BCDOT instead proposes building 6.35 road miles of infrastructure from 2020-2025, using just $3 million of local and federal dollars total. About 3 miles of this proposal are facilities that should have been built back in 2017.

If we’re being generous and count all 6.35 miles of infrastructure, BCDOT plans to ignore 92% of the plan they paid to develop and asked the Planning Commission to adopt. At the pace they propose, it will take over 70 years to implement the 5 year Separated Lane Network Plan.

After overwhelmingly negative feedback at the Mayor’s Bicycle Advisory Commission yesterday, it’s possible BCDOT will again revise their CIP request for today’s Planning Commission hearing.

But here’s where we’re at right now:

  • A BCDOT budget that blatantly ignores adopted city plans

  • A bicycle program over 20 miles behind schedule and a clear plan to fall further behind

  • Constant threats to downgrade and remove existing bike infrastructure

  • A missed deadline on the very first Complete Streets Ordinance update

  • A mass departure of talented BCDOT staff

  • Rising injury and death on our roadways

Even if the CIP is revised to show everything we want on paper, how can the Director be trusted to faithfully implement it, given these past two presentations, where we were told there was no capacity or intent to do that very implementation? How can we trust this agency to act in good faith when all the signs listed above prove they’re failing on nearly every front?

Baltimore City Department of Transportation will present their revised CIP at 3:00PM today, with public comment to follow. We plan to be there to highlight our concerns, and welcome citizens to join us.

Baltimore City DOT CIP Follow-Up | 417 E. Fayette Street, 8th Floor | 3:00PM until comments conclude

If you can’t join us, you’re also welcome to send an email expressing your concerns and the meaningful affect of bicycle infrastructure on your choice to live, work, and play in Baltimore to the Planning Department for inclusion in the Commission file (deptofplanning@baltimorecity.gov) and BCDOT Director Pourciau (michelle.pourciau@baltimorecity.gov).

It's the first budget after Complete Streets, and there's $0 for bikes.

The 2017 Separated Lane Network Plan. To stay on schedule, everything in Purple should be constructed this year, but none of it will be.

The 2017 Separated Lane Network Plan. To stay on schedule, everything in Purple should be constructed this year, but none of it will be.

You read that right.

It’s been just over a month since the passage of Baltimore Complete Streets, the nationally recognized Complete Streets ordinance that legally mandates Baltimore design streets through an equity lens, and prioritize pedestrians and bicyclists to the greatest extent possible. Baltimore City Department of Transportation was required to provide an update to the Baltimore City Council Land Use and Transportation Committee on day 30 after enactment, but no such update came.

Instead, we were greeted with the FY2020-2025 Capital Improvement Program, the city’s latest budget documents. Traditionally, Baltimore City DOT includes line item 508-019 Citywide Bike Infrastructure, which details proposed funding for bike improvements over the following six fiscal years, breaking down revenue sources by general/local funds, state grants, and federal highway grants and allocations.

FY2019-2024 CIP showing the line item for Citywide Bike Infrastructure. It was removed in this year’s CIP.

FY2019-2024 CIP showing the line item for Citywide Bike Infrastructure. It was removed in this year’s CIP.

The 2017 Separated Lane Network Plan, adopted by the Baltimore City Planning Commission under Mayor Pugh, specifically calls for $1,000,000 per year of General Funds for five years. By leveraging Maryland Department of Transportation Bikeways and Federal Transportation Alternatives Program grants that require a local match, this approximately $5 million in local dollars could build the entire Separated Lane Network in five years. Building this network would connect 85% of Baltimoreans to low stress bicycle infrastructure. It’s one of the lowest cost, highest return bike plans in the country.

2017 Separated Lane Network construction timeline, budget, and revenue sources.

2017 Separated Lane Network construction timeline, budget, and revenue sources.

It’s pretty simple. Win big grants with small matches of local dollars. Build 17 miles of high quality separated and supporting infrastructure per year for five years. End with one of the best networks in the country.

Instead, we have no money for design and construction this year. Baltimore City Department of Transportation will tell you they plan on building 17 miles of infrastructure in 2019, and that everything’s fine. But let’s take a look at what that infrastructure actually is:

BCDOT’s proposed timelines for bike facilities

BCDOT’s proposed timelines for bike facilities

Every project listed for “Proposed 2019” is a prior year project. Every single one of these projects was already counted in lane mile totals in 2017 when the Separated Lane Network plan was adopted, because all of these projects were supposed to have been constructed by then. Delaying projects by anywhere from 3-7 years doesn’t mean you get to count them again.

The “Proposed 2020-2022” projects include MLK Jr, Eutaw Street, 20th Street, and Baker Street. If you refer back to the Separated Lane Network Plan map at the top, you’ll see these projects are supposed to be completed this year, in 2019, not proposed for 2022, the year the entire network plan is supposed to be built.

In short, Baltimore City Department of Transportation has budgeted zero dollars of new bike design and construction money for the next six years. The projects they’re double counting as mileage are projects that were already counted in prior years. And the new projects they’re proposing are coming years late, if at all since they haven’t promised funding alongside them.

We will be testifying at the Baltimore City Planning Commission on Thursday, January 10th about this disparity between city-adopted plans and the Capital Improvement Budget.

Over the next few weeks, we’ll also highlight some planned and ongoing infrastructure projects that are costing or will cost the city millions of dollars while making streets less safe for people walking, biking, and taking public transit.

Baltimore City Department of Transportation knew this Complete Streets ordinance was coming. They knew it was going to pass. This budget was an opportunity for them to show that they were making preparations to right their ship, but instead they continue to fire cannons at their own sails.

ICYMI: Big Win for #CompleteStreets

Baltimore-city-council-complete-streets.jpg

We did it. Together, with your support we passed the most progressive Complete Streets Ordinance in the country. It’s a huge win for biking, walking and transit. Thanks to your letters, your testimony and donations, we were able to do something that two years ago people doubted we could achieve. Led by Councilman Ryan Dorsey, lawmakers, city agencies, Bikemore and over 30 Complete Streets coalition members, we demonstrated Baltimore is ready to think differently about how are streets are designed.

Here’s what the bill does:

  • Gives neighbors more input into the process of street design. 


  • Makes sure investments in Complete Streets go to the communities that need them the most. 


  • Mandates progressive standards on street design to keep everyone who uses the road safe from reckless driving. 


Read the entire bill.

Last night while celebrating our victory, a community leader said that Bikemore is “punching above our weight.” Our work is gaining the attention of people across the city and is changing the conversation around how we design streets.

We fought for streets that prioritize your safety and we won. Help us celebrate our victory by making a donation to Bikemore today. Together we are building a force for biking in Baltimore, and we are winning.